Skyline Central 1 Apartments, Manchester – Cladding Installation and Replacement

Sister apartment block to Skyline 2 but with a different freeholder. Replacement of existing flammable cladding system 10000m2 in a tenanted building.

Scope of Works

  • Remove existing cladding system.
  • Make good substrate wall.
  • Install membranes to existing windows.
  • Install new compliant fire safe cladding system.
  • Install replacement windows in lieu of failed Profilit glazing.

Access was via scaffolding, mast climbers, cradles and IRATA technicians.

PXL_20220826_114536364
DJI_0252
PXL_20220826_114445882
PXL_20220826_114536364
PXL_20220826_114445882
previous arrow
next arrow