Beetham Tower, Hilton, Manchester – Glass Replacement

beetham tower manchester glass replacement

We are the nominated Façade Contractor for high level glass replacements by the Facilities management company, our extended insurances allows us to work up to 190m which is a requirement for this building being one of the highest in Manchester.

We were tasked to replace a damaged Level 49 Double glazed unit on the prestigious Hilton hotel in a busy Manchester city centre environment.

Scope of works:

  • Call out to make safe the shattered glass unit.
  • Provide a qualified & Experienced Lifting team
  • Provide experienced curtain wall installers with work at height, leading edge & safety harness training.
  • Access the building via the House BMU (building maintenance unit/cradle)
  • Remove structurally bonded damaged DGU
  • Safely Lower glazed unit 180m to ground level.
  • Attach new glazed unit to vacuum lifter and BMU lifting rig and return to level 49 for reinstallation.
  • Bond and seal new DGU to unitised element frame
  • Clean and tidy works following completion with Client sign off